For export towards Algeria. Project 20382 designed by the Almaz Central marine Design Bureau to succeed the Grisha-vlass and she is herself to be succeeded by the Gremyashchy-class. In July 2011 ordered Algeria 2 ships with as building costs 120-150 million US dollars each, one to be handed over in 2014 and the second one in 2015. Suitable for coastal patrol, escort and anti submarine warfare tasks.