An item reported that at le Havre, France two destroyers were to be built and to be delivered at Cherbourg, France for executing their trials. It was of a new design and larger as the predecessors. Displacement 350 ton with a length of 58 metres against the 306-307 tons of the predecessors, horsepower 7.200ihp and a speed of 30 knots.