Former known as Gawron-class corvette in fact a licence variant of the Blohm&Voss MEKO A-100 project. Laid down by Stocznia Marynarki Wojennej, Gdynia, Poland on 28 November 2001, launched on 2 June 2015, commissioned on 29 November 2019. With a displacement of 1.800 (standard)-2.150 (full load) tons and as dimensions 95,2 x 13,5 x 3,60 metres or 312 x 44 x 11.8 feet. The propulsion consists of 1 GE LM2500 gas turbine and 2 MTU 12V595TE90 diesels allowing a speed of 30 knots and a range of 4.500 nautical miles. Crew numbers maximum 97 men. Fitted out with a flight deck. Armament consists of 1-7,6cm/3” Oto Melara gun, 2-3cm Oto Melara Marlin-WS guns, 4-12.7mm/0.50” WKM-B machineguns and 4 GROM surface-to-air missiles.

No comments:
Post a Comment