An item reported that the Dutch shipyard Nederlandsche Scheepsbouwmatschappij received an order from the Maschino Import at Moscow, Soviet Union to built a third timber vessel with a capacity of 3.635 tons similar to the two ordered eind February. The ship was to be delivered in March 1936.