In the meeting of the director and the commissaries pm 15 March 1908 was a letter of the minister of navy discussed. He intended to sent an engineer and a navy officer to investigate the developments in the field of submarines. The minister wondered of the Electric Boat Company wanted to cooperate.(1) De Kon. Mij. Schelde would sent a letter to the USA with this request. Further more reported the director that the contract with the shipyard of Whitehead at Fiume was approved.
Note
1. For the first submarine (the Luctor et Emergo)was a design of the Electric Boat Company in the USA used. She was delivered to the Royal Netherlands Navy and commissioned as the Hr.Ms. O 1.
Source
Archive Kon.Mij. De Schelde 1875-1970 (Municipality Archive, Vlissingen, Netherlands) archive 214 inventory number 8.
Note
1. For the first submarine (the Luctor et Emergo)was a design of the Electric Boat Company in the USA used. She was delivered to the Royal Netherlands Navy and commissioned as the Hr.Ms. O 1.
Source
Archive Kon.Mij. De Schelde 1875-1970 (Municipality Archive, Vlissingen, Netherlands) archive 214 inventory number 8.