Photo made by Andreas Kendristakis 12 April 2010, thanks for allowing us to publish it
Laid down in 1977 at the Perama Shipyard and commissioned on 6 March 1978. With a displacement of 345 tons (full load) and as dimensions 30 x 7,9 x 3,4 metres or 98.5’ x 26’ x 11.3’. Fitted out with a 1.200 hp/882kW Deutz MWM diesel allowing a speed of 12 knots.