Translate

Thursday, 5 October 2017

Russian frigate Admiral Makarov (799) 2012-


Near Kiel, Germany 1 August 2017

Project 11356 Grigorovich. Consisting of the Admiral Grigorovich, Admiral Makarov, Admiral Butakov, Admiral Istomin, Admiral Kornilov and1Admiral Essen. Contract awarded to the Yantar Shipyard, Kaliningrad, Russia on 8 October 2010. Laid down on 29 February 2012, launched on 2 September 2015 and commissioned in 2017. Black Sea Fleet.

General class specifications. Displacement 3.620 (standard)-40.35 (full load) and as dimensions 124,8 x 15,2 x 4,2 metres or 409 x 50 x 14 feet. The totally 60.900 shp machinery consist of 2x8.450shp  DS-71 cruise gas turbines and 2x22.000shp DT-59 boost gas turbines allowing with 2 shafts a speed of 30 knots and a range of 4.850 nautical miles with a speed of 14 knots. Crew numbers 200 men. Can take a KA-27PL or Ka-31 helicopter with her. Armament consist of 1-10cm A-190 Arsenal naval gun, 1-8 UKSK 3S14 VLS cells for Kalibr and Oniks and Zircon[2], 2-12 3S90M Shtil-1 VLS cells, 2 Kashtan CIWS, 8 Igla-1 (SA-16), 2×2-53,3 cm torpedo tubes and 1 RBU-6000 rocket launcher.