An item reported that the designs for the two new Swedish coastal defence ships were completed. Estimated building costs for each ship 37 million crones. Speed was just above the 22 knots. The armament was to consist of 4-24cm/9,4” guns, 6-12cm/4,7” guns, 8-4cm/1,57” guns and some machineguns.