Translate

Friday, 29 December 2017

Dry dock to be built at Puget Sound, USA according to the Dutch magazine Marineblad dated 1907-1908 No. 7

An item reported that the firm McLellon&Co., Seattle, USA was ordered by the US government to built a dock at Puget Sound with the dimensions 652 x 115 x 38 feet with as costs 1.192.284 US dollars.