Vlissingen-Oost, Netherlands 20 October 2012
Originally located in Block 53/1a of the Southern part of the Nort Sea. In 2012 dismantled off the British coast by the Rambiz and transported on the barge Osprey Trader towards the Kaloothaven at Vlissingen-Oost, Netherlands where she arrived on 25 July. There to be broken up by the firm Hoondert. Was a so-called Normalyy Unmanned Installation (NUI) located in 11metres deep water standing on a sandbank on a distance of around 80 kilometres from Great Yarmouth. It consisted if 1 575 jacket included the piles, a 1.212 ton topsides included the processing equipment and further more six platform wells. Last gas production in June 2009. Since December 2006 owned and managed by Energy Resource Technology (UK) Limited (ERT), a division of HELIX.