Maas, Rotterdam, Netherlands 31 May 2016
Casco prepared at ATS Vlissingen-Oost, Netherlands and launched in the Scaldia harbour, Vlissingen-Oost in December 2015. At the shipyard Trico, Rotterdam, Netherlands started begin January with completing her. The expectation was to deliver her in April-May 2016. Owned and managed by Van Laar Maritime, Ijmuiden, Netherlands.
New details added 9-72016
Owned by Miranda Shipping B.V., Nassau, Bahamas and managed by Van Laar Maritime B.V., IJmuiden, Netherlands. Built by All Techno Support Services B.V., Vlissingen / 701 and completed by Shipyard Trico B.V., Rotterdam, Netherlands. Dimensions 37.50 x 9.40 x 3.00 metres. Gross register tonnage 399 tons. IMO 9738258 and Call sign C6CR7. Trials on the Haringvliet-Vuile Gat on 24 June 2016 and delivered by the shipyard on 1 July 2016.