An item reported that Japan presented a project for a 30,000 tons submarine tanker to be fitted out with a 180 thermal MW pressurized water reactor (PWR) fuelled with UO2-zircalloy with 1.7% of enrichment allowing a submerged cruising speed of 22 knots. Core 9,200 MW day/tons. Refuelling every two years after 10,000 operating hours at full load.
Source
R. Gibrat. Nuclear naval propulsion: tankers, liners
(Conditions of profitability). Translation of a paper presented at the Nuclear
Energy Days Conference held at Milan, December 12-14, 1958. Original title
Propulsion Naval Nucléaire: Petroliers, Paquebots (Conditions de rentabilité.
No comments:
Post a Comment