An item reported that the Royal Italian torpedo plant at San Bartolomeo intended to engage an extra 145 workmen for the period 1911/1912-1914/1915 to be able in manufacturing a reserve of 1.000 torpedoes for the navy. The annual production would in this manner to be increased from 100 tot 250 torpedoes. Despite this increase were the costs reduced while the costs of a modern torpedo from this plant were 8.000 lires and for a torpedo manufactured by Whitehead at Fiume [Rijkea, Croatia] 14.000 lires.