An item reported that in the Polish harbour Gdansk just repair shipyards were visible and new constructions were not sighted. There were at least two dry docks and further more a dry dock with a minimum capacity of 10.000 tons.
Source
The report was published on www.archive.org, document number CIA-RDP80T00246A003600540001-2